Home/The Atlas/Logistics & Mobility
The Atlas · Logistics & Mobility

What India’s changing logistics infrastructure means for industrial competitiveness

The gateway to Techadyant’s infrastructure intelligence: the national programmes building India’s freight system, the industrial nodes they reach, and the bottlenecks and opportunities that follow.

A logistics website asksWhat is happening in logistics?
A government platform asksWhere is the infrastructure?
Techadyant asksWhat does it mean for industrial competitiveness?

Where are the bottlenecks? · Which industrial nodes benefit? · Which supply chains change? · Which technologies become relevant? · Where do new opportunity surfaces appear?

01 · The logistics system at a glanceFact

The freight system, measured

Headline figures with a source on file, each with its own date. Figures from different dates are not combined.

Dedicated freight corridors built
2,843 kmEDFC 1,337 km complete (Dec 2023) + WDFC 1,506 km fully operational (Sep 2026)As of 8 Sept 2026 · Verified · source →
Bharatmala Phase-I constructed
22,709 kmof 34,800 km approved in 2017; new sanctions discontinued since Nov 2023As of 22 Jul 2026 · sourced on programme page · source →
Major-port cargo, FY 2025-26
915 MTrecord; 855 MT in FY 2024-25As of 11 Apr 2026 · Single-source · source →
Inland-waterway cargo, FY 2024-25
145.5 MTrecord movement on national waterwaysAs of 24 Apr 2025 · Single-source · source →
Projects evaluated on the Gati Shakti NMP
396 projectsworth about ₹18.66 lakh croreAs of 12 Aug 2026 · sourced on programme page · source →
Sagarmala projects completed
315 projects₹1.57 lakh crore of an 845-project, ₹6.06 lakh crore portfolioAs of 24 Mar 2026 · sourced on programme page · source →
02 · Programme Intelligence

National infrastructure programmes

The programmes reshaping India’s physical and digital logistics architecture, each read for what it changes in industry. All programmes →

Cross-cutting layerPM GatiShakti National Master PlanOne geospatial plan · project evaluation through the Network Planning Group
  1. Industrial nodes
  2. Supply chains
  3. Opportunity surfaces
03 · Featured research

Reports on the system

04 · What we are watching

Open questions

ITLA stands up 6 Oct 2026

The new authority will technically appraise every Government transport project of ₹500 crore or more and build a National Transport Data Repository. Watch for its first appraisals and data releases.

What follows Bharatmala Phase-I 22 Jul 2026

New Phase-I sanctions have been discontinued since Nov 2023 while awarded corridors are completed. The successor framework will decide which industrial routes get the next highway money.

Does the full WDFC move freight off the road? 8 Sept 2026

The Western DFC became fully operational on 8 Sep 2026. Whether manufacturers on the corridor shift volume depends on terminals and tariffs, not track length.

Cargo terminals reach the nodes 13 Jan 2026

118 of 306 approved Gati Shakti Cargo Terminals were commissioned by Jan 2026. Their locations relative to industrial nodes are the next layer to map.

Sagarmala 2.0 and the Coastal Economic Zones 11 Apr 2026

A Sagarmala 2.0 (₹3.6 lakh crore total investment) is proposed; the 14 CEZs remain at perspective-plan stage. Port-led industrialisation is the pillar to watch.

05 · Signals from the system

Latest logistics signals

Signals on freight, ports, rail, corridors and terminals — selected automatically from the Signals feed. All signals →

S-205 · 22 Nov 2026

Indian Navy Takes Delivery of DSC A21: Catamaran Diving Support Craft Tests Private-Sector Auxiliary Shipbuilding

The Indian Navy officially took delivery of DSC A21 (Yard 326), the second of five specialized catamaran-hull Diving Support Craft being built by Kolkata-based private shipbuilder Titagarh Rail Systems Limited (TRSL), at the Naval Dockyard in Mumbai on 20 November 2026. Designed under Indian Register of Shipping rules with hydrodynamic hull-form validation by DRDO’s Naval Science and Technological Laboratory, the vessel achieves approximately 70% indigenous content. While the delivery reflects steady execution in private-sector naval auxiliary production, it also highlights the persistent gap between indigenous steel hull fabrication and imported specialized deep-sea diving life-support equipment.

Read Signal →
S-200 · 18 Nov 2026

India Joins Pax Silica: The AI Supply-Chain Framework Now Needs an Industrial Test

India joined the United States and eight other governments in signing the San Francisco Declaration on 15 November under the US-led Pax Silica initiative. The declaration treats AI infrastructure, semiconductors, critical minerals, energy, ports, logistics and digital systems as one security-linked supply chain, and proposes five working groups to turn that common view into coordination. It does not create a binding procurement obligation, a technology-transfer guarantee or a new Indian funding programme. Its value will be measured by what follows: trusted industrial partnerships, resilient inputs and actual capacity built in India.

Read Signal →
S-144 · 7 Oct 2026

India Approves a Rs 10,000 Crore SME Equity Fund and a New Logistics Authority

On 6 October 2026 the Union Cabinet cleared two separate decisions: a Rs 10,000 crore SME Growth Fund that takes direct equity in small and medium enterprises, and an Integrated Transport & Logistics Authority to plan, appraise and monitor transport infrastructure and run a national freight-data layer. Read together they are a capital lever and a coordination lever aimed at the same goal. Both are institutional decisions, not spending or procurement, and the outcomes depend on execution that has not happened yet.

Read Signal →
S-129 · 28 Sep 2026

India's First Port-Based E-Methanol Plant Breaks Ground at Kandla

The foundation stone has been laid for India''s first port-based e-methanol plant at Deendayal Port (Kandla) - a Rs 2,300 crore, 150 TPD joint venture between the port authority and Assam Petro-Chemicals, using renewable power, water and biogenic CO2 to make green marine fuel for the Asia-Europe corridor. Maritime fuel is a hard dependency layer for trade and defence logistics; siting green-fuel production at the port where ships already stop is a real move, but a foundation stone is not operating capacity.

Read Signal →
06 · Industrial consequencesTechadyant analysis

What the programmes change for industry

One consequence from each programme page, where the full reasoning, sources and the other dimensions sit.

Gati Shakti

Industrial nodes are becoming planning objects, not just destinations

Once a cluster is a layer, its connectivity can be evaluated against it before approval. That favours nodes with a strategic anchor — the Dholera rail line is the clearest case in this Atlas.

All consequences →
Bharatmala

Corridors reprice industrial locations

For a greenfield node, the first fast road link is often what makes construction, workforce and early logistics practical before rail arrives.

All consequences →
Sagarmala

Gateway throughput and speed are rising

Faster turnaround lowers the cost of using an Indian gateway rather than transhipping. That matters most for container-heavy manufacturing exports.

All consequences →
07 · Industrial connectivity

Industrial nodes and the programmes that reach them

Industrial Connectivity Score from the node methodology. A programme is listed only where an evidenced project links it to the node.

Industrial nodeStateConnectivity (ICS)Programmes reaching it
Dholera Industrial NodeGujarat55/100 · ModeratePM GatiShakti National Master Plan — via Ahmedabad (Sarkhej)–Dholera semi high-speed double lineBharatmala Pariyojana — via Ahmedabad–Dholera Greenfield Expressway (NE-8)
Sanand Industrial NodeGujarat85/100 · Very strongSagarmala Programme — via Road over bridge at LC-235, Deendayal Port (Kandla) → Deendayal Port (Kandla)Dedicated Freight Corridors — via Western DFC final sections (New Sanand N–New Makarpura; New Umbergaon–New Saphale; New Saphale–New JNPT)
Jewar–YEIDA Industrial NodeUttar Pradesh75/100 · StrongPM GatiShakti National Master Plan — via Noida International Airport, Jewar — Phase 1Dedicated Freight Corridors — via Western DFC final sections (New Sanand N–New Makarpura; New Umbergaon–New Saphale; New Saphale–New JNPT)
Jagiroad Industrial NodeAssam45/100 · ModerateNo evidenced programme link yet
Sriperumbudur–Oragadam Electronics BeltTamil Nadu75/100 · StrongBharatmala Pariyojana — via Bengaluru–Chennai Expressway (greenfield)
Kopparthy Electronics Node (YSR EMC)Andhra Pradesh50/100 · ModerateNo evidenced programme link yet
08 · Opportunity surfacesOpportunity surface

Where opportunity may appear

Hypotheses with a sourced trigger and stated constraints. Not claims that government will procure anything, and never forecasts of contracts.

Bharatmala PariyojanaConfidence: Emerging

Port-access roads and logistics parks — the parts of Bharatmala Phase-I that lagged

Trigger
Parliament’s Public Accounts Committee (Apr 2024, on CAG audit data to Mar 2023) found coastal & port connectivity roads only 5.2% completed and none of 35 planned multimodal logistics parks developed, while the highway corridors raced ahead. New Phase-I sanctions have been discontinued since Nov 2023.
Read on the programme page →
PM GatiShakti National Master Plan · Dedicated Freight CorridorsConfidence: Medium

Rail cargo terminals as the industrial node’s freight interface

Trigger
The Ministry of Railways’ Gati Shakti Cargo Terminal policy (Dec 2021) had 306 terminals approved and 118 commissioned by Jan 2026, with about ₹8,600 crore of private investment — including the first GCT on private land along the Western DFC.
Read on the programme page →
Sagarmala ProgrammeConfidence: Emerging

Port-adjacent processing in Coastal Economic Zones

Trigger
Sagarmala’s port-led industrialisation pillar proposes 14 Coastal Economic Zones with perspective plans prepared; a Sagarmala 2.0 with ₹3.6 lakh crore of total investment is proposed (Apr 2026).
Read on the programme page →
Bharatmala PariyojanaConfidence: Medium

Warehousing and distribution consolidation along the Delhi–Mumbai Expressway

Trigger
The 1,386 km, ~Rs 1 lakh crore Delhi–Mumbai Expressway is ~80% complete (Jul 2026) with full completion signalled within two years, and delivers a dedicated ~3 km spur to Jawaharlal Nehru Port (Package 13).
Read on the programme page →
Bharatmala PariyojanaConfidence: Medium

Mineral-belt export logistics via the Raipur–Visakhapatnam corridor

Trigger
The 465 km, Rs 16,482 crore Raipur–Visakhapatnam Economic Corridor (NH-130CD) is expected to complete by December 2026 and, per PIB, will be "directly linked to the Visakhapatnam Port and the Chennai-Kolkata National Highway" with "improved connectivity to ports and industrial hubs, quicker exports, smoother supply chains".
Read on the programme page →
Bharatmala PariyojanaConfidence: Emerging

All-weather Ladakh logistics once the Zojila tunnel opens

Trigger
The 13.153 km Zojila tunnel — listed by NHIDCL under Bharatmala Pariyojana works — achieved final breakthrough on 9 Jun 2026; opening is reported to be targeted around February 2028.
Read on the programme page →
Sagarmala ProgrammeConfidence: High

Vadhavan's successive marine-works and equipment waves (2026-2035)

Trigger
The ₹76,220 crore Vadhavan port is under construction: a ₹5,301 crore breakwater EPC awarded to Afcons (June 2026) and a dredging/reclamation letter of award to an ITD Cementation-DEME-Jan De Nul JV (March 2025).
Read on the programme page →
Sagarmala ProgrammeConfidence: Medium

Transshipment service economy around Vizhinjam's first million TEUs

Trigger
Vizhinjam Phase 1 commenced commercial operations on 3 December 2024 with a designed capacity of 1 million TEUs and crossed 1 million TEUs in its first year — the fastest pace set by any Indian port; later phases target ~5.7 M TEUs.
Read on the programme page →
Sagarmala ProgrammeConfidence: High

Shipbuilding supplier localisation on the ₹69,725 crore policy base

Trigger
The Cabinet-approved shipbuilding package (24 September 2025) provides ₹69,725 crore — SBFAS ₹24,736 crore to March 2036, the Maritime Development Fund ₹25,000 crore and Shipbuilding Dock Support ₹19,989 crore — targeting 4.5 million GT of additional capacity, while Cochin Shipyard holds ~74 vessels on order and HSL's order book has grown ten-fold in three years.
Read on the programme page →
Logistics reference layerAnalyst-assessed

A public aperture into the >= Rs 500 crore transport project pipeline

Reading
ITLA is mandated to technically appraise Government of India infrastructure projects costing Rs 500 crore or more, and to monitor and run post-implementation impact assessment on them. As the SPV stands up, this mandate may produce centralised public documentation (appraisal records, monitoring outputs) for a project tier that is today scattered across ministries. Techadyant treats this as a potential research surface — v2 of this Atlas will add projects only as their primary records are captured. This states no expectation that any specific project will be announced, approved or procured.
Caveat
Potential, not procurement. Analyst judgement — no external primary source.
Logistics reference layerAnalyst-assessed

Freight-flow / O-D analytics capability may emerge from the NTDR

Reading
ITLA's National Transport Data Repository is mandated to integrate GSTN e-way bill, FASTag, Vahan, GPS-based and urban traffic datasets and to run freight-flow / origin-destination analytics for planning, monitoring and impact assessment. If the NTDR or ITLA publications release flow data or analyses, they may support a sourced v3 (freight-flow / O-D) layer of this Atlas. Until such a public release exists, Techadyant will not model any flows — the v3 section stays a stub marked "needs a human source".
Caveat
Potential, not procurement. Conditional on future public data releases that do not yet exist.
Logistics reference layerAnalyst-assessed

SME Growth Fund equity may deepen Tier-II/III freight demand over time

Reading
The SME Growth Fund's direct-equity mandate targets growth-stage SMEs with a majority orientation toward manufacturing and Tier-II/III clusters. If implemented at scale, a deepening manufacturing SME base in these clusters may, over multi-year horizons, generate additional freight demand and supplier flows along existing corridor infrastructure (DFC, Bharatmala). This is a demand-side possibility for monitoring — not a forecast, and not a claim about any procurement or scheme disbursement.
Caveat
Potential, not procurement. Multi-year analyst judgement — no external primary source.
09 · Related industrial ecosystems

Where to go next in the Atlas

10 · Reference layerFact

India Integrated Logistics Atlas — the source record

Every programme, corridor and node held in the SID logistics schema, with its verification label and captured sources. Programme pages build on these records. Snapshot 24 Nov 2026.

Module contents

What the Logistics Atlas holds

  • Programmes tracked12
  • Corridor records4
  • Nodes (ports, MMLPs, gateways)4
  • Projects ≥ ₹500 crore (v2)0
  • Opportunity surfaces3

Snapshot 24 Nov 2026. Baked from the SID logistics schema at build time (logistics_export() RPC); the committed snapshot is a seed fallback until the SID is populated.

Evidence

How each record is evidenced

Verified 3Single-source 9Analyst-assessed 3Needs a human source 8
  • Verified — Two or more independent primary sources on file (e.g. a ministry disclosure plus an independent dataset).
  • Single-source — One cited reference on file; not yet independently corroborated.
  • Analyst-assessed — Analyst judgement — no external primary source linked yet.
  • Needs a human source — No primary source fully captured yet. Figures are deliberately left blank rather than filled from memory; a human must capture the source first.

"Verified" means two or more independent primary sources — a deliberately strict bar, identical to the dependency Atlas. Records marked "needs a human source" assert no figures at all.

The hook

The two Cabinet decisions of 6 October 2026

Integrated Transport & Logistics Authority (ITLA) — an SPV mandated to technically appraise Government of India transport projects of ₹500 crore or more, monitor them, and build a National Transport Data Repository integrating GSTN e-way bill, FASTag, Vahan, GPS and urban-traffic data to run freight-flow / O-D analytics. That mandate organises this module: v1 is the reference layer below; v2 is the ≥₹500 crore project pipeline; v3 is the freight-flow layer — built only where public data genuinely supports it.

The companion decision, the SME Growth Fund (SGF) (₹10,000 crore of direct equity for growth-stage SMEs, majority-oriented to manufacturing and Tier-II/III clusters), enters this module as a demand-side input: what may, over years, generate more freight — not a transport programme itself.

Companion signal: S-144 (SME Growth Fund + ITLA), published 6 Oct 2026. Sources on each record below.

v1 — Reference layer

Flagship programmes & authorities

Announced vs built is stated on every row. Figures appear only where a primary source is on file; a blank row is a sourcing gap, not a zero.

Authority / institution

Integrated Transport & Logistics Authority (ITLA)

Single-source

PMO / Cabinet (SPV) · approved (6 Oct 2026)

SPV approved by the Union Cabinet on 6 Oct 2026 as the national apex institution for integrated transport and logistics planning, research, project appraisal, monitoring and data analytics. Prepares a National Transport Master Plan with a 10+ year horizon covering roads, railways, ports and shipping, civil aviation, inland waterways, coastal shipping, urban mobility and logistics; undertakes technical appraisal of Government of India projects costing Rs 500 crore or more (financial appraisal stays with existing mechanisms); monitors projects above Rs 500 crore; and builds a National Transport Data Repository integrating GSTN e-way bill, FASTag, Vahan, GPS-based systems and urban traffic data for freight-flow / O-D analytics.

Technical-appraisal threshold
500 ₹ crore

One primary (PM India release) captured in full. PIB Cabinet release of the same date is title+date-confirmed but its PRID URL is unpinned — pin it to upgrade to verified. Companion signal: S-144 (SME Growth Fund + ITLA).

Source record (4)
  • PIB — Cabinet approves setting up of Integrated Transport & Logistics Authority (6 Oct 2026) (www.pib.gov.in — URL pin pending)Supports: Corroborating Cabinet release (URL pin pending — gates the verified upgrade)Release title and 6 Oct 2026 date confirmed via search index. Exact PRID URL could not be resolved from the build sandbox — pin it (pib.gov.in release of 6 Oct 2026) to upgrade ITLA to verified (PM India + PIB = two primaries on file).
  • Prime Minister of India (pmindia.gov.in) — Cabinet approves setting up of Integrated Transport & Logistics Authority (6 Oct 2026)Supports: SPV status; National Transport Master Plan 10+ yr horizon; >= Rs 500 crore technical appraisal; monitoring above Rs 500 crore; NTDR datasets; freight-flow/O-D analytics; NLP review mandate“ITLA will undertake technical appraisal of infrastructure projects of Government of India, costing Rs.500 crore or more. […] [NTDR will] obtain relevant transport and logistics datasets from multiple sources, including GSTN e-way bill, FASTag, Vahan, GPS-based systems, urban traffic management systems […] and carry out data analytics (e.g. Freight Flow/O-D analytics).”
  • Business Standard — Cabinet approves new body to integrate transport and logistics (6 Oct 2026) (www.business-standard.com — URL pin pending)lead only — never a sole sourceSupports: Trade-press corroboration (lead only)Trade-press corroboration of the 6 Oct 2026 Cabinet decision (lead only; never a sole source).
  • DD News (Prasar Bharati) — Cabinet approves setting up of Integrated Transport & Logistics Authority (6 Oct 2026) (ddnews.gov.in — URL pin pending)lead only — never a sole sourceSupports: Government-broadcaster corroboration; master-plan mode coverage“The plan will cover roads, railways, ports and shipping, civil aviation, inland waterways, coastal shipping, urban mobility and logistics.”Government-broadcaster corroboration; snippet confirms the National Transport Master Plan mode coverage (roads, railways, ports and shipping, civil aviation, inland waterways, coastal shipping, urban mobility and logistics).

Corridor programme

Bharatmala Pariyojana

Single-source

Ministry of Road Transport & Highways · awarding/construction in progress

Umbrella highway programme approved 2017. As on 28 Feb 2025: 26,425 km awarded of a planned 34,800 km; 19,826 km constructed; 6,669 km of high-speed greenfield corridors awarded, of which 4,610 km completed; total expenditure Rs 4,92,562 crore.

Planned
34,800 km
Awarded
26,425 km
Constructed
19,826 km
Greenfield awarded
6,669 km
Greenfield completed
4,610 km
Expenditure incurred
4,92,562 ₹ crore

Figures confirmed verbatim in the captured PIB/I&B specific doc (PDF on file) and independently matched by the PIB 13 Mar 2025 release snippet. Both are PIB-family sources, so the row remains single_source until a MoRTH/NHAI dashboard capture adds a genuinely independent primary.

Source record (2)
  • PIB — Implementation of Bharatmala Pariyojana (13 Mar 2025) (www.pib.gov.in — URL pin pending)Supports: Independent PIB release matching awarded/constructed figures (URL pin pending)“As on 28.02.2025, projects covering a total length of 26,425 km have been awarded and out of this, 19,826 km have already been constructed.”Search-index snippet from pib.gov.in reads verbatim: "As on 28.02.2025, projects covering a total length of 26,425 km have been awarded and out of this, 19,826 km have already been constructed." Matches the captured I&B doc. PRID URL to be pinned as the second reference.
  • PIB / Ministry of Information & Broadcasting — Building Bharat — Powering Infrastructure Through Make in India (specific doc) (1 Apr 2025)Supports: Planned/awarded/constructed km; greenfield awarded/completed km; expenditure — as on 28 Feb 2025“As on February 28, 2025, 26,425 km of projects awarded under the planned 34,800 km, with 19,826 km already constructed. The total Expenditure incurred under Bharatmala Pariyojana amounts to Rs. 4,92,562 crore. […] 6,669 km of high-speed greenfield corridors awarded, of which 4,610 km have been completed.”

Dedicated Freight Corridors (EDFC + WDFC)

Verified

Ministry of Railways / DFCCIL · complete — EDFC (Dec 2023) and WDFC (Sep 2026)

Two dedicated freight-corridor lines built by DFCCIL to shift bulk rail freight off the passenger network. Eastern (Ludhiana–Sonnagar, 1,337 km): construction fully completed, Dec 2023 (PIB). Western (Dadri–JNPT, ~1,504–1,506 km): completed and fully operational after the final three sections were dedicated on 8 Sep 2026 (PMO; JICA). The Sonnagar–Dankuni extension of the EDFC is not part of the completed figure.

EDFC (Ludhiana–Sonnagar) — construction complete
1,337 km
WDFC (Dadri–JNPT) — fully operational
1,506 km
Final WDFC sections dedicated, 8 Sep 2026
326 route km

WDFC completion rests on two independent primaries (PMO release + JICA, the project lender) plus the DFCCIL route page; EDFC completion on a PIB release. Supersedes the 2025 '~2,557 km (~90%)' seed figure. 8 Oct 2026 correction.

Source record (6)

Ports & maritime

Major ports cargo throughput

Single-source

Ministry of Ports, Shipping & Waterways · operational

Aggregate cargo handled by India's major ports: record ~915 million tonnes in FY 2025-26 (per PIB 11 Apr 2026 feature), 855 million tonnes in FY 2024-25 and 819 million tonnes in FY 2023-24 (per MoPSW statement carried by Prasar Bharati's NewsOnAir).

Major-port cargo FY 2025-26
915 MT
Major-port cargo FY 2024-25
855 MT
Major-port cargo FY 2023-24
819 MT

Two government publishers (PIB; Prasar Bharati/MoPSW) but neither URL is pinned yet; treated as one sourcing chain until pinned. Port-level breakdown lives in the nodes table.

Source record (2)
  • NewsOnAir (Prasar Bharati) — Cargo handled by India's major ports surges to record 855 million tonnes (1 Apr 2025) (newsonair.gov.in — URL pin pending)Supports: FY2024-25 = 855 MT; FY2023-24 = 819 MT (MoPSW attribution; URL pin pending)“In a statement, the Ministry of Ports, Shipping and Waterways said that the country's ports handled 819 million tonnes of cargo in the financial year 2023-24.”Government-broadcaster report attributing to MoPSW: FY2023-24 = 819 million tonnes; FY2024-25 = 855 million tonnes (headline). Treat as one source (Prasar Bharati); URL to be pinned.
  • PIB — Sagarmala: Transforming India's Maritime Landscape (11 Apr 2026) (www.pib.gov.in — URL pin pending)Supports: Record ~915 MT in FY 2025-26 (URL pin pending)“India's major ports handled a record 915 million tonnes of cargo in FY 2025-26.”Snippet from pib.gov.in reads: "9.84 million tonnes per annum of cargo handling capacity. India's major ports handled a record 915 million tonnes of cargo in FY 2025-26." Programme-totals (projects/cost) NOT yet captured — left null. PRID URL to be pinned.

Sagarmala Programme

Needs a human source

Ministry of Ports, Shipping & Waterways · in progress

Port-led development programme: port modernisation, port connectivity enhancement, port-led industrialisation, coastal shipping and inland waterways transport, and coastal community development. Programme totals (projects identified/completed, estimated cost) are not yet captured here.

No figures asserted — needs a human source before any metric is entered.

Programme page confirmed at host level only; WAF blocked automated capture. The PIB 11 Apr 2026 feature (title+date confirmed) covers components — human to capture programme-level totals from shipmin.gov.in or the PIB release.

Source record (2)
  • PIB — Sagarmala: Transforming India's Maritime Landscape (11 Apr 2026) (www.pib.gov.in — URL pin pending)Supports: Component/feature coverage; major-port cargo record (URL pin pending)“India's major ports handled a record 915 million tonnes of cargo in FY 2025-26.”Snippet from pib.gov.in reads: "9.84 million tonnes per annum of cargo handling capacity. India's major ports handled a record 915 million tonnes of cargo in FY 2025-26." Programme-totals (projects/cost) NOT yet captured — left null. PRID URL to be pinned.
  • Ministry of Ports, Shipping & Waterways — SAGARMALA — programme page (shipmin.gov.in — URL pin pending)Supports: Programme identity and pillar structure (URL pin pending)shipmin.gov.in Sagarmala programme page confirmed via search index. Site WAF-rejected automated fetch; human to capture programme totals (projects identified/completed, estimated cost).

Inland waterways

Inland Waterways Authority of India — National Waterways

Single-source

Ministry of Ports, Shipping & Waterways / IWAI · operational

Statutory authority for national waterways (NW-1 Ganga, NW-2 Brahmaputra, NW-3 West Coast Canal among 111 declared). Record cargo movement of 145.5 million tonnes achieved in FY 2024-25.

Cargo moved FY 2024-25
145.5 MMT

Figure from the PIB 24 Apr 2025 release (snippet captured from pib.gov.in; PRID unpinned). Human to pin the release URL and add IWAI data as second source.

Source record (1)
  • PIB / IWAI — India's Record Cargo Movement on Inland Waterways — Achieves 145.5 million tonnes in FY 2024-25 (24 Apr 2025) (www.pib.gov.in — URL pin pending)Supports: Record FY2024-25 cargo movement on national waterways (URL pin pending)“Achieves 145.5 million tonnes in FY 2024-25 — Fairway Maintenance — NW-1 (Ganga River) — NW-2 (Brahmaputra River) — NW-3 (West Coast Canal, Kerala).”Snippet from pib.gov.in reads: "Achieves 145.5 million tonnes in FY 2024-25 — Fairway Maintenance — NW-1 (Ganga River) — NW-2 (Brahmaputra River) — NW-3 (West Coast Canal, Kerala)". PRID URL to be pinned.

Policy & digital platform

Logistics Ease Across Different States (LEADS)

Needs a human source

DPIIT · annual (latest edition not yet captured)

Annual DPIIT index of logistics ease across States and UTs; upgraded in recent editions to combine perception surveys with objective indicators. Used here (v1) as the reference layer for state-level logistics readiness; no edition results captured yet.

No figures asserted — needs a human source before any metric is entered.

Exists and is DPIIT-run per secondary/edu sources, but no official LEADS edition page or PDF is captured. Human to pin the latest LEADS report from dpiit.gov.in.

Source record (1)
  • DPIIT — National Logistics Policy (NLP) — programme page (www.dpiit.gov.in — URL pin pending)Supports: LEADS as DPIIT-run annual index (canonical report page not yet captured)dpiit.gov.in NLP page confirmed via search index; snippet: "National Logistics Policy (NLP). Launched in 2022. Complements PM Gati Shakti. Reduce Logistics Cost — comparable to global benchmarks by 2030." Page is Akamai-blocked from the build sandbox; human to capture the canonical URL.

Multimodal Logistics Parks (MMLPs)

Needs a human source

MoRTH / NHAI · planned/partial

Logistics parks planned under the Bharatmala umbrella co-locating warehousing, intermodal transfer and handling facilities. The build brief cites 11 identified under Bharatmala Phase II; a MoRTH Year-End Review 2025 (via trade mirror) refers to a planned network of 35 MMLPs with ~Rs 46,000 crore total investment. Scopes differ and neither is captured from a primary yet.

No figures asserted — needs a human source before any metric is entered.

Primary-source capture required: reconcile 11 (Phase II) vs 35 (network) framings from PIB/MoRTH originals. No MMLP count or cost is asserted in any scored claim.

Source record (1)
  • MoRTH (via indiashippingnews.com mirror) — Year End Review 2025 — Ministry of Road Transport & Highways (31 Dec 2025) (indiashippingnews.com — URL pin pending)lead only — never a sole sourceSupports: LEAD ONLY: 35-MMLP network framing from MoRTH year-end review (trade mirror; original not captured)“A network of 35 Multimodal Logistics Parks is planned to be developed as part of Bharatmala Pariyojana, with a total investment of about Rs. 46 […].”LEAD ONLY — trade mirror of the MoRTH year-end review; snippet: "A network of 35 Multimodal Logistics Parks is planned to be developed as part of Bharatmala Pariyojana, with a total investment of about Rs. 46 [thousand crore]". Not entered as a figure anywhere. Human to capture the PIB/MoRTH original and reconcile with the 11-MMLPs-under-Phase-II framing.

National Logistics Policy (NLP)

Needs a human source

DPIIT · in force

Policy launched in 2022, complementary to PM Gati Shakti, with the stated goal of reducing logistics cost to levels comparable with global benchmarks by 2030. DPIIT has since issued guidelines for City Logistics Plans. ITLA is mandated to advise on and assist review/updation of NLP (2022).

No figures asserted — needs a human source before any metric is entered.

Programme page confirmed only at host level (Akamai-blocked sandbox). Launch date (17 Sep 2022), baseline/2022 logistics-cost figure and target percentages deliberately left null until the DPIIT/PIB primary is captured.

Source record (2)
  • DPIIT — National Logistics Policy (NLP) — programme page (www.dpiit.gov.in — URL pin pending)Supports: NLP launched 2022; complements PM Gati Shakti; cost-to-global-benchmarks-by-2030 goal (URL pin pending)“National Logistics Policy (NLP). Launched in 2022. Complements PM Gati Shakti. Reduce Logistics Cost — comparable to global benchmarks by 2030.”dpiit.gov.in NLP page confirmed via search index; snippet: "National Logistics Policy (NLP). Launched in 2022. Complements PM Gati Shakti. Reduce Logistics Cost — comparable to global benchmarks by 2030." Page is Akamai-blocked from the build sandbox; human to capture the canonical URL.
  • PIB — India Marks Three Years of National Logistics Policy (16 Sept 2025) (www.pib.gov.in — URL pin pending)Supports: Three-year implementation review release (URL pin pending)Release title and 16 Sep 2025 date confirmed via search index (snippet: DPIIT City Logistics Plans guidelines under NLP). PRID URL to be pinned.

PM Gati Shakti National Master Plan

Single-source

DPIIT (NPG mechanism) · operational

GIS-based national master plan for multimodal infrastructure planning; Network Planning Group (NPG) evaluates major projects for network alignment. As of 13 Mar 2025, 115 NH/road projects covering ~13,500 km with Rs 6.38 lakh crore investment had been evaluated; by 10 Feb 2026 the NPG mechanism had evaluated 352 infrastructure projects worth Rs 16.10 lakh crore (programme-wide scope).

NH/road projects evaluated
115
NH/road km evaluated
13,500 km (approx.)
NH/road investment
6.38 ₹ lakh crore
NPG projects evaluated (all infrastructure)
352
NPG evaluated investment
16.1 ₹ lakh crore

NH/road figures confirmed verbatim in the captured PIB/I&B doc. The 352/16.10 figures come from the PIB 10 Feb 2026 release title+snippet (PRID unpinned) — same publisher family, so single_source stands.

Source record (2)
  • PIB / Ministry of Information & Broadcasting — Building Bharat — Powering Infrastructure Through Make in India (specific doc) (1 Apr 2025)Supports: 115 NH/road projects, ~13,500 km, Rs 6.38 lakh crore evaluated as of 13 Mar 2025“As of March 13, 2025, 115 National Highway and road projects covering approximately 13,500 km, with an investment of Rs 6.38 lakh crore, have been evaluated under the initiative.”
  • PIB — PM GatiShakti Network Planning Group Evaluates 352 Infrastructure Projects Worth Rs 16.10 Lakh Crore (10 Feb 2026) (www.pib.gov.in — URL pin pending)Supports: NPG programme-wide evaluation totals as of 10 Feb 2026 (URL pin pending)“As on date, 352 infrastructure projects with total estimated cost of Rs 16.10 Lakh Crore have been evaluated through the NPG mechanism.”Snippet from pib.gov.in reads verbatim: "As on date, 352 infrastructure projects with total estimated cost of Rs 16.10 Lakh Crore have been evaluated through the NPG mechanism." Programme-wide scope (all infrastructure) — distinct from the 115 NH/road-project figure in the Apr 2025 I&B doc. PRID URL to be pinned.

SME Growth Fund (SGF)

Single-source

Government of India (Union Budget 2026-27, Para 28) · approved (6 Oct 2026)

Union Cabinet commitment of Rs 10,000 crore (6 Oct 2026) toward a fund providing growth-oriented, patient direct equity for Small and Medium Enterprises — targeting champion Indian enterprises across manufacturing, services, technology, innovation-driven sectors and strategic value chains. Addresses a structural gap: existing equity funds focus on early-stage/micro enterprises.

Government commitment
10,000 ₹ crore

One primary (PM India release) captured in full; PIB release title+date-confirmed, PRID unpinned. Included here because equity for manufacturing SMEs and Tier-II/III clusters is a demand-side input to the logistics system, not a transport programme.

Source record (2)
  • PIB — Small and Medium Enterprises Growth Fund (6 Oct 2026) (www.pib.gov.in — URL pin pending)Supports: Corroborating PIB release (URL pin pending — gates the verified upgrade)“Union Cabinet has approved a commitment of Rs 10,000 crore towards establishing the SME Growth Fund (SGF). The Fund will provide patient equity”Release title and 6 Oct 2026 date confirmed via search index (snippet: "Union Cabinet has approved a commitment of Rs 10,000 crore towards establishing the SME Growth Fund (SGF). The Fund will provide patient equity"). PRID URL to be pinned by a human to upgrade to verified.
  • Prime Minister of India (pmindia.gov.in) — Cabinet approves Commitment of Rs.10,000 Crore towards establishment of the SME Growth Fund for direct equity investments in Small and Medium Enterprises to create future champions (6 Oct 2026)Supports: Rs 10,000 crore commitment; direct equity; Union Budget 2026-27 Para 28 anchor; structural-gap rationale“The Union Cabinet, chaired by Prime Minister Shri Narendra Modi, today approved the Government of India's commitment of Rs.10,000 crore towards the establishment of the SME Growth Fund (SGF) aimed at catalysing growth-oriented capital for India's Small and Medium Enterprises (SMEs).”

Unified Logistics Interface Platform (ULIP)

Needs a human source

DPIIT / NICDC-NLDSL · operational

Digital gateway that lets industry access logistics-related datasets from multiple government systems through API-based integration (freight-relevant systems include e-way bill, FASTag, Vahan and customs-related platforms).

No figures asserted — needs a human source before any metric is entered.

Description sourced from the PIB 8 Jul 2026 release snippet. API/system/ministry counts conflict across secondary sources (114/36/8 vs 125/39/11) and are deliberately omitted until an official count is captured.

Source record (1)
  • PIB — NICDC's Logistics Arm NLDSL and Government of Punjab (ULIP partnership) (8 Jul 2026) (www.pib.gov.in — URL pin pending)Supports: ULIP as unified digital gateway (URL pin pending; official API/system counts not yet captured)“ULIP serves as a unified digital gateway for logistics-related data from multiple government systems through API-based integration.”Snippet from pib.gov.in reads: "ULIP serves as a unified digital gateway for logistics-related data from multiple government systems through API-based integration." API/system counts deliberately NOT entered (secondary counts conflict: 114 APIs/36 systems/8 ministries vs 125 APIs/39 systems/11 ministries) — needs human capture of an official count. PRID URL to be pinned.
v1 — Reference layer

National freight corridors

Corridor records. Length and endpoint fields are filled only from a captured DFCCIL / PIB / MoRTH primary — endpoints from secondary literature are not stored. What these corridors mean for specific industrial nodes: Industrial Nodes & Connectivity.

CorridorModeLengthCommissioned / constructedStatusEvidence
Bharatmala Pariyojana road network (Phase-I aggregate)Road34,800 km19,826 km26,425 km awarded; 19,826 km constructed as on 28 Feb 2025 (greenfield: 6,669 km awarded / 4,610 km completed).Single-source
Dedicated Freight Corridor network (EDFC + WDFC combined)Railneeds a human source2,843 kmEDFC construction complete (Dec 2023) and WDFC fully operational (Sep 2026); 1,337 km + 1,506 km.Verified
Eastern Dedicated Freight Corridor (EDFC)Rail1,337 km1,337 kmConstruction fully completed (13 Dec 2023).Single-source
Western Dedicated Freight Corridor (WDFC)Rail1,506 km1,506 kmCompleted and fully operational (final sections dedicated 8 Sep 2026).Verified
Corridor source record
Bharatmala Pariyojana road network (Phase-I aggregate)

Planned (34,800 km) and constructed (19,826 km) figures confirmed in the captured PIB/I&B doc. length_commissioned_km carries "constructed" for road programmes by convention noted here.

Dedicated Freight Corridor network (EDFC + WDFC combined)

Combined figure derived from the two corridor rows (EDFC 1,337 km per PIB; WDFC 1,506 km per JICA). Total network length kept null because the Sonnagar–Dankuni extension is outside the completed figure.

Eastern Dedicated Freight Corridor (EDFC)

One primary (PIB, Dec 2023). The Sonnagar–Dankuni section is not included.

Western Dedicated Freight Corridor (WDFC)

Two independent primaries (PMO release; JICA). DFCCIL route page gives 1,504 km; JICA 1,506 km — the higher figure is shown, the discrepancy noted.

v1 — Reference layer

Nodes — ports & logistics parks

A starter node set. Coordinates are stored only where publicly published; throughput only with a source on file. The full node layer ships with v2.

NodeTypeStateThroughputStatusEvidence
Deendayal Port (Kandla)PORTGujaratneeds a human sourceoperationalNeeds a human source
Jawaharlal Nehru Port Authority (JNPA)PORTMaharashtraneeds a human sourceoperationalNeeds a human source
Multimodal Logistics Park — representative stubMMLP—needs a human sourceplannedNeeds a human source
Mumbai PortPORTMaharashtrahighest-ever throughput, FY 2024-25 note · 68.63 cargo mt fy25operationalSingle-source
v2 — Project pipeline

Projects ≥ ₹500 crore (ITLA appraisal tier)

Not yet built — by design. v2 will list verified transport and logistics projects of ₹500 crore or more: the tier ITLA is mandated to technically appraise. A project enters only when its primary record (PIB release, ministry document, or dashboard entry) is captured and stored in the SID logistics.projects table. No project is listed from memory or trade press.

v3 — Freight-flow / O-D layer

Freight flows & origin–destination

Stub — needs a human source. ITLA’s National Transport Data Repository is mandated to integrate e-way bill, FASTag, Vahan, GPS and urban-traffic data and run freight-flow / O-D analytics. Until a public, citable flow dataset or ITLA publication exists, Techadyant will not model any flow: an origin–destination layer built on unsourced numbers would be exactly the fabrication this module exists to prevent. When ITLA (or a ministry dashboard) publishes usable flow data, this section becomes v3.

Method

How this module is built

The module follows the same architecture as the dependency Atlas: records live in a dedicated logistics schema on the SID Supabase project, are exported by a logistics_export() RPC, and are baked to a static snapshot at build time by scripts/bake-logistics.mjs. Nothing on this page is hand-edited — a figure changes by changing the schema record (with its source link), then rebuilding. verified, single-source and analyst-assessed carry the same definitions as the rest of the Atlas (see Methodology); the fourth label, needs a human source, marks a deliberate gap: a row or field we will not fill from memory or trade press. Primary sources on file are listed per record above, including what each source supports and, where captured, the supporting text. Trade press appears only as a flagged lead, never as a sole source.

Programme Intelligence adds a second layer on top of these records — the Techadyant reading of each programme — in data/programme-intelligence/, with links derived from evidenced project, node, signal and report records. Snapshot 24 Nov 2026 · baked from logistics_export · sources retrieved 6–8 Oct 2026.