India Integrated Logistics Atlas

India’s freight and logistics system as a source-led reference layer: the corridors that move the country’s goods, the flagship programmes building them, and — from 6 October 2026 — the new Integrated Transport & Logistics Authority that will appraise every Government transport project of ₹500 crore or more. Every figure carries its source and a verification label. Where a fact cannot be verified from a primary source, it is left out and marked needs a human source.

12 programmes4 corridor records4 nodesSnapshot 8 Oct 2026
Module contents

What the Logistics Atlas holds

  • Programmes tracked12
  • Corridor records4
  • Nodes (ports, MMLPs, gateways)4
  • Projects ≥ ₹500 crore (v2)0
  • Opportunity surfaces3

Snapshot 8 Oct 2026. Baked from the SID logistics schema at build time (logistics_export() RPC); the committed snapshot is a seed fallback until the SID is populated.

Evidence

How each record is evidenced

Verified 3Single-source 9Analyst-assessed 3Needs a human source 8
  • Verified — Two or more independent primary sources on file (e.g. a ministry disclosure plus an independent dataset).
  • Single-source — One cited reference on file; not yet independently corroborated.
  • Analyst-assessed — Analyst judgement — no external primary source linked yet.
  • Needs a human source — No primary source fully captured yet. Figures are deliberately left blank rather than filled from memory; a human must capture the source first.

"Verified" means two or more independent primary sources — a deliberately strict bar, identical to the dependency Atlas. Records marked "needs a human source" assert no figures at all.

The hook

The two Cabinet decisions of 6 October 2026

Integrated Transport & Logistics Authority (ITLA) — an SPV mandated to technically appraise Government of India transport projects of ₹500 crore or more, monitor them, and build a National Transport Data Repository integrating GSTN e-way bill, FASTag, Vahan, GPS and urban-traffic data to run freight-flow / O-D analytics. That mandate organises this module: v1 is the reference layer below; v2 is the ≥₹500 crore project pipeline; v3 is the freight-flow layer — built only where public data genuinely supports it.

The companion decision, the SME Growth Fund (SGF) (₹10,000 crore of direct equity for growth-stage SMEs, majority-oriented to manufacturing and Tier-II/III clusters), enters this module as a demand-side input: what may, over years, generate more freight — not a transport programme itself.

Companion signal: S-144 (SME Growth Fund + ITLA), published 6 Oct 2026. Sources on each record below.

v1 — Reference layer

Flagship programmes & authorities

Announced vs built is stated on every row. Figures appear only where a primary source is on file; a blank row is a sourcing gap, not a zero.

Authority / institution

Integrated Transport & Logistics Authority (ITLA)

Single-source

PMO / Cabinet (SPV) · approved (6 Oct 2026)

SPV approved by the Union Cabinet on 6 Oct 2026 as the national apex institution for integrated transport and logistics planning, research, project appraisal, monitoring and data analytics. Prepares a National Transport Master Plan with a 10+ year horizon covering roads, railways, ports and shipping, civil aviation, inland waterways, coastal shipping, urban mobility and logistics; undertakes technical appraisal of Government of India projects costing Rs 500 crore or more (financial appraisal stays with existing mechanisms); monitors projects above Rs 500 crore; and builds a National Transport Data Repository integrating GSTN e-way bill, FASTag, Vahan, GPS-based systems and urban traffic data for freight-flow / O-D analytics.

Technical-appraisal threshold
500 ₹ crore

One primary (PM India release) captured in full. PIB Cabinet release of the same date is title+date-confirmed but its PRID URL is unpinned — pin it to upgrade to verified. Companion signal: S-144 (SME Growth Fund + ITLA).

Source record (4)
  • PIB — Cabinet approves setting up of Integrated Transport & Logistics Authority (6 Oct 2026) (www.pib.gov.in — URL pin pending)Supports: Corroborating Cabinet release (URL pin pending — gates the verified upgrade)Release title and 6 Oct 2026 date confirmed via search index. Exact PRID URL could not be resolved from the build sandbox — pin it (pib.gov.in release of 6 Oct 2026) to upgrade ITLA to verified (PM India + PIB = two primaries on file).
  • Prime Minister of India (pmindia.gov.in) — Cabinet approves setting up of Integrated Transport & Logistics Authority (6 Oct 2026)Supports: SPV status; National Transport Master Plan 10+ yr horizon; >= Rs 500 crore technical appraisal; monitoring above Rs 500 crore; NTDR datasets; freight-flow/O-D analytics; NLP review mandate“ITLA will undertake technical appraisal of infrastructure projects of Government of India, costing Rs.500 crore or more. […] [NTDR will] obtain relevant transport and logistics datasets from multiple sources, including GSTN e-way bill, FASTag, Vahan, GPS-based systems, urban traffic management systems […] and carry out data analytics (e.g. Freight Flow/O-D analytics).”
  • Business Standard — Cabinet approves new body to integrate transport and logistics (6 Oct 2026) (www.business-standard.com — URL pin pending)lead only — never a sole sourceSupports: Trade-press corroboration (lead only)Trade-press corroboration of the 6 Oct 2026 Cabinet decision (lead only; never a sole source).
  • DD News (Prasar Bharati) — Cabinet approves setting up of Integrated Transport & Logistics Authority (6 Oct 2026) (ddnews.gov.in — URL pin pending)lead only — never a sole sourceSupports: Government-broadcaster corroboration; master-plan mode coverage“The plan will cover roads, railways, ports and shipping, civil aviation, inland waterways, coastal shipping, urban mobility and logistics.”Government-broadcaster corroboration; snippet confirms the National Transport Master Plan mode coverage (roads, railways, ports and shipping, civil aviation, inland waterways, coastal shipping, urban mobility and logistics).

Corridor programme

Bharatmala Pariyojana

Single-source

Ministry of Road Transport & Highways · awarding/construction in progress

Umbrella highway programme approved 2017. As on 28 Feb 2025: 26,425 km awarded of a planned 34,800 km; 19,826 km constructed; 6,669 km of high-speed greenfield corridors awarded, of which 4,610 km completed; total expenditure Rs 4,92,562 crore.

Planned
34,800 km
Awarded
26,425 km
Constructed
19,826 km
Greenfield awarded
6,669 km
Greenfield completed
4,610 km
Expenditure incurred
4,92,562 ₹ crore

Figures confirmed verbatim in the captured PIB/I&B specific doc (PDF on file) and independently matched by the PIB 13 Mar 2025 release snippet. Both are PIB-family sources, so the row remains single_source until a MoRTH/NHAI dashboard capture adds a genuinely independent primary.

Source record (2)
  • PIB — Implementation of Bharatmala Pariyojana (13 Mar 2025) (www.pib.gov.in — URL pin pending)Supports: Independent PIB release matching awarded/constructed figures (URL pin pending)“As on 28.02.2025, projects covering a total length of 26,425 km have been awarded and out of this, 19,826 km have already been constructed.”Search-index snippet from pib.gov.in reads verbatim: "As on 28.02.2025, projects covering a total length of 26,425 km have been awarded and out of this, 19,826 km have already been constructed." Matches the captured I&B doc. PRID URL to be pinned as the second reference.
  • PIB / Ministry of Information & Broadcasting — Building Bharat — Powering Infrastructure Through Make in India (specific doc) (1 Apr 2025)Supports: Planned/awarded/constructed km; greenfield awarded/completed km; expenditure — as on 28 Feb 2025“As on February 28, 2025, 26,425 km of projects awarded under the planned 34,800 km, with 19,826 km already constructed. The total Expenditure incurred under Bharatmala Pariyojana amounts to Rs. 4,92,562 crore. […] 6,669 km of high-speed greenfield corridors awarded, of which 4,610 km have been completed.”

Dedicated Freight Corridors (EDFC + WDFC)

Verified

Ministry of Railways / DFCCIL · complete — EDFC (Dec 2023) and WDFC (Sep 2026)

Two dedicated freight-corridor lines built by DFCCIL to shift bulk rail freight off the passenger network. Eastern (Ludhiana–Sonnagar, 1,337 km): construction fully completed, Dec 2023 (PIB). Western (Dadri–JNPT, ~1,504–1,506 km): completed and fully operational after the final three sections were dedicated on 8 Sep 2026 (PMO; JICA). The Sonnagar–Dankuni extension of the EDFC is not part of the completed figure.

EDFC (Ludhiana–Sonnagar) — construction complete
1,337 km
WDFC (Dadri–JNPT) — fully operational
1,506 km
Final WDFC sections dedicated, 8 Sep 2026
326 route km

WDFC completion rests on two independent primaries (PMO release + JICA, the project lender) plus the DFCCIL route page; EDFC completion on a PIB release. Supersedes the 2025 '~2,557 km (~90%)' seed figure. 8 Oct 2026 correction.

Source record (6)

Ports & maritime

Major ports cargo throughput

Single-source

Ministry of Ports, Shipping & Waterways · operational

Aggregate cargo handled by India's major ports: record ~915 million tonnes in FY 2025-26 (per PIB 11 Apr 2026 feature), 855 million tonnes in FY 2024-25 and 819 million tonnes in FY 2023-24 (per MoPSW statement carried by Prasar Bharati's NewsOnAir).

Major-port cargo FY 2025-26
915 MT
Major-port cargo FY 2024-25
855 MT
Major-port cargo FY 2023-24
819 MT

Two government publishers (PIB; Prasar Bharati/MoPSW) but neither URL is pinned yet; treated as one sourcing chain until pinned. Port-level breakdown lives in the nodes table.

Source record (2)
  • NewsOnAir (Prasar Bharati) — Cargo handled by India's major ports surges to record 855 million tonnes (1 Apr 2025) (newsonair.gov.in — URL pin pending)Supports: FY2024-25 = 855 MT; FY2023-24 = 819 MT (MoPSW attribution; URL pin pending)“In a statement, the Ministry of Ports, Shipping and Waterways said that the country's ports handled 819 million tonnes of cargo in the financial year 2023-24.”Government-broadcaster report attributing to MoPSW: FY2023-24 = 819 million tonnes; FY2024-25 = 855 million tonnes (headline). Treat as one source (Prasar Bharati); URL to be pinned.
  • PIB — Sagarmala: Transforming India's Maritime Landscape (11 Apr 2026) (www.pib.gov.in — URL pin pending)Supports: Record ~915 MT in FY 2025-26 (URL pin pending)“India's major ports handled a record 915 million tonnes of cargo in FY 2025-26.”Snippet from pib.gov.in reads: "9.84 million tonnes per annum of cargo handling capacity. India's major ports handled a record 915 million tonnes of cargo in FY 2025-26." Programme-totals (projects/cost) NOT yet captured — left null. PRID URL to be pinned.

Sagarmala Programme

Needs a human source

Ministry of Ports, Shipping & Waterways · in progress

Port-led development programme: port modernisation, port connectivity enhancement, port-led industrialisation, coastal shipping and inland waterways transport, and coastal community development. Programme totals (projects identified/completed, estimated cost) are not yet captured here.

No figures asserted — needs a human source before any metric is entered.

Programme page confirmed at host level only; WAF blocked automated capture. The PIB 11 Apr 2026 feature (title+date confirmed) covers components — human to capture programme-level totals from shipmin.gov.in or the PIB release.

Source record (2)
  • PIB — Sagarmala: Transforming India's Maritime Landscape (11 Apr 2026) (www.pib.gov.in — URL pin pending)Supports: Component/feature coverage; major-port cargo record (URL pin pending)“India's major ports handled a record 915 million tonnes of cargo in FY 2025-26.”Snippet from pib.gov.in reads: "9.84 million tonnes per annum of cargo handling capacity. India's major ports handled a record 915 million tonnes of cargo in FY 2025-26." Programme-totals (projects/cost) NOT yet captured — left null. PRID URL to be pinned.
  • Ministry of Ports, Shipping & Waterways — SAGARMALA — programme page (shipmin.gov.in — URL pin pending)Supports: Programme identity and pillar structure (URL pin pending)shipmin.gov.in Sagarmala programme page confirmed via search index. Site WAF-rejected automated fetch; human to capture programme totals (projects identified/completed, estimated cost).

Inland waterways

Inland Waterways Authority of India — National Waterways

Single-source

Ministry of Ports, Shipping & Waterways / IWAI · operational

Statutory authority for national waterways (NW-1 Ganga, NW-2 Brahmaputra, NW-3 West Coast Canal among 111 declared). Record cargo movement of 145.5 million tonnes achieved in FY 2024-25.

Cargo moved FY 2024-25
145.5 MMT

Figure from the PIB 24 Apr 2025 release (snippet captured from pib.gov.in; PRID unpinned). Human to pin the release URL and add IWAI data as second source.

Source record (1)
  • PIB / IWAI — India's Record Cargo Movement on Inland Waterways — Achieves 145.5 million tonnes in FY 2024-25 (24 Apr 2025) (www.pib.gov.in — URL pin pending)Supports: Record FY2024-25 cargo movement on national waterways (URL pin pending)“Achieves 145.5 million tonnes in FY 2024-25 — Fairway Maintenance — NW-1 (Ganga River) — NW-2 (Brahmaputra River) — NW-3 (West Coast Canal, Kerala).”Snippet from pib.gov.in reads: "Achieves 145.5 million tonnes in FY 2024-25 — Fairway Maintenance — NW-1 (Ganga River) — NW-2 (Brahmaputra River) — NW-3 (West Coast Canal, Kerala)". PRID URL to be pinned.

Policy & digital platform

Logistics Ease Across Different States (LEADS)

Needs a human source

DPIIT · annual (latest edition not yet captured)

Annual DPIIT index of logistics ease across States and UTs; upgraded in recent editions to combine perception surveys with objective indicators. Used here (v1) as the reference layer for state-level logistics readiness; no edition results captured yet.

No figures asserted — needs a human source before any metric is entered.

Exists and is DPIIT-run per secondary/edu sources, but no official LEADS edition page or PDF is captured. Human to pin the latest LEADS report from dpiit.gov.in.

Source record (1)
  • DPIIT — National Logistics Policy (NLP) — programme page (www.dpiit.gov.in — URL pin pending)Supports: LEADS as DPIIT-run annual index (canonical report page not yet captured)dpiit.gov.in NLP page confirmed via search index; snippet: "National Logistics Policy (NLP). Launched in 2022. Complements PM Gati Shakti. Reduce Logistics Cost — comparable to global benchmarks by 2030." Page is Akamai-blocked from the build sandbox; human to capture the canonical URL.

Multimodal Logistics Parks (MMLPs)

Needs a human source

MoRTH / NHAI · planned/partial

Logistics parks planned under the Bharatmala umbrella co-locating warehousing, intermodal transfer and handling facilities. The build brief cites 11 identified under Bharatmala Phase II; a MoRTH Year-End Review 2025 (via trade mirror) refers to a planned network of 35 MMLPs with ~Rs 46,000 crore total investment. Scopes differ and neither is captured from a primary yet.

No figures asserted — needs a human source before any metric is entered.

Primary-source capture required: reconcile 11 (Phase II) vs 35 (network) framings from PIB/MoRTH originals. No MMLP count or cost is asserted in any scored claim.

Source record (1)
  • MoRTH (via indiashippingnews.com mirror) — Year End Review 2025 — Ministry of Road Transport & Highways (31 Dec 2025) (indiashippingnews.com — URL pin pending)lead only — never a sole sourceSupports: LEAD ONLY: 35-MMLP network framing from MoRTH year-end review (trade mirror; original not captured)“A network of 35 Multimodal Logistics Parks is planned to be developed as part of Bharatmala Pariyojana, with a total investment of about Rs. 46 […].”LEAD ONLY — trade mirror of the MoRTH year-end review; snippet: "A network of 35 Multimodal Logistics Parks is planned to be developed as part of Bharatmala Pariyojana, with a total investment of about Rs. 46 [thousand crore]". Not entered as a figure anywhere. Human to capture the PIB/MoRTH original and reconcile with the 11-MMLPs-under-Phase-II framing.

National Logistics Policy (NLP)

Needs a human source

DPIIT · in force

Policy launched in 2022, complementary to PM Gati Shakti, with the stated goal of reducing logistics cost to levels comparable with global benchmarks by 2030. DPIIT has since issued guidelines for City Logistics Plans. ITLA is mandated to advise on and assist review/updation of NLP (2022).

No figures asserted — needs a human source before any metric is entered.

Programme page confirmed only at host level (Akamai-blocked sandbox). Launch date (17 Sep 2022), baseline/2022 logistics-cost figure and target percentages deliberately left null until the DPIIT/PIB primary is captured.

Source record (2)
  • DPIIT — National Logistics Policy (NLP) — programme page (www.dpiit.gov.in — URL pin pending)Supports: NLP launched 2022; complements PM Gati Shakti; cost-to-global-benchmarks-by-2030 goal (URL pin pending)“National Logistics Policy (NLP). Launched in 2022. Complements PM Gati Shakti. Reduce Logistics Cost — comparable to global benchmarks by 2030.”dpiit.gov.in NLP page confirmed via search index; snippet: "National Logistics Policy (NLP). Launched in 2022. Complements PM Gati Shakti. Reduce Logistics Cost — comparable to global benchmarks by 2030." Page is Akamai-blocked from the build sandbox; human to capture the canonical URL.
  • PIB — India Marks Three Years of National Logistics Policy (16 Sept 2025) (www.pib.gov.in — URL pin pending)Supports: Three-year implementation review release (URL pin pending)Release title and 16 Sep 2025 date confirmed via search index (snippet: DPIIT City Logistics Plans guidelines under NLP). PRID URL to be pinned.

PM Gati Shakti National Master Plan

Single-source

DPIIT (NPG mechanism) · operational

GIS-based national master plan for multimodal infrastructure planning; Network Planning Group (NPG) evaluates major projects for network alignment. As of 13 Mar 2025, 115 NH/road projects covering ~13,500 km with Rs 6.38 lakh crore investment had been evaluated; by 10 Feb 2026 the NPG mechanism had evaluated 352 infrastructure projects worth Rs 16.10 lakh crore (programme-wide scope).

NH/road projects evaluated
115
NH/road km evaluated
13,500 km (approx.)
NH/road investment
6.38 ₹ lakh crore
NPG projects evaluated (all infrastructure)
352
NPG evaluated investment
16.1 ₹ lakh crore

NH/road figures confirmed verbatim in the captured PIB/I&B doc. The 352/16.10 figures come from the PIB 10 Feb 2026 release title+snippet (PRID unpinned) — same publisher family, so single_source stands.

Source record (2)
  • PIB / Ministry of Information & Broadcasting — Building Bharat — Powering Infrastructure Through Make in India (specific doc) (1 Apr 2025)Supports: 115 NH/road projects, ~13,500 km, Rs 6.38 lakh crore evaluated as of 13 Mar 2025“As of March 13, 2025, 115 National Highway and road projects covering approximately 13,500 km, with an investment of Rs 6.38 lakh crore, have been evaluated under the initiative.”
  • PIB — PM GatiShakti Network Planning Group Evaluates 352 Infrastructure Projects Worth Rs 16.10 Lakh Crore (10 Feb 2026) (www.pib.gov.in — URL pin pending)Supports: NPG programme-wide evaluation totals as of 10 Feb 2026 (URL pin pending)“As on date, 352 infrastructure projects with total estimated cost of Rs 16.10 Lakh Crore have been evaluated through the NPG mechanism.”Snippet from pib.gov.in reads verbatim: "As on date, 352 infrastructure projects with total estimated cost of Rs 16.10 Lakh Crore have been evaluated through the NPG mechanism." Programme-wide scope (all infrastructure) — distinct from the 115 NH/road-project figure in the Apr 2025 I&B doc. PRID URL to be pinned.

SME Growth Fund (SGF)

Single-source

Government of India (Union Budget 2026-27, Para 28) · approved (6 Oct 2026)

Union Cabinet commitment of Rs 10,000 crore (6 Oct 2026) toward a fund providing growth-oriented, patient direct equity for Small and Medium Enterprises — targeting champion Indian enterprises across manufacturing, services, technology, innovation-driven sectors and strategic value chains. Addresses a structural gap: existing equity funds focus on early-stage/micro enterprises.

Government commitment
10,000 ₹ crore

One primary (PM India release) captured in full; PIB release title+date-confirmed, PRID unpinned. Included here because equity for manufacturing SMEs and Tier-II/III clusters is a demand-side input to the logistics system, not a transport programme.

Source record (2)
  • PIB — Small and Medium Enterprises Growth Fund (6 Oct 2026) (www.pib.gov.in — URL pin pending)Supports: Corroborating PIB release (URL pin pending — gates the verified upgrade)“Union Cabinet has approved a commitment of Rs 10,000 crore towards establishing the SME Growth Fund (SGF). The Fund will provide patient equity”Release title and 6 Oct 2026 date confirmed via search index (snippet: "Union Cabinet has approved a commitment of Rs 10,000 crore towards establishing the SME Growth Fund (SGF). The Fund will provide patient equity"). PRID URL to be pinned by a human to upgrade to verified.
  • Prime Minister of India (pmindia.gov.in) — Cabinet approves Commitment of Rs.10,000 Crore towards establishment of the SME Growth Fund for direct equity investments in Small and Medium Enterprises to create future champions (6 Oct 2026)Supports: Rs 10,000 crore commitment; direct equity; Union Budget 2026-27 Para 28 anchor; structural-gap rationale“The Union Cabinet, chaired by Prime Minister Shri Narendra Modi, today approved the Government of India's commitment of Rs.10,000 crore towards the establishment of the SME Growth Fund (SGF) aimed at catalysing growth-oriented capital for India's Small and Medium Enterprises (SMEs).”

Unified Logistics Interface Platform (ULIP)

Needs a human source

DPIIT / NICDC-NLDSL · operational

Digital gateway that lets industry access logistics-related datasets from multiple government systems through API-based integration (freight-relevant systems include e-way bill, FASTag, Vahan and customs-related platforms).

No figures asserted — needs a human source before any metric is entered.

Description sourced from the PIB 8 Jul 2026 release snippet. API/system/ministry counts conflict across secondary sources (114/36/8 vs 125/39/11) and are deliberately omitted until an official count is captured.

Source record (1)
  • PIB — NICDC's Logistics Arm NLDSL and Government of Punjab (ULIP partnership) (8 Jul 2026) (www.pib.gov.in — URL pin pending)Supports: ULIP as unified digital gateway (URL pin pending; official API/system counts not yet captured)“ULIP serves as a unified digital gateway for logistics-related data from multiple government systems through API-based integration.”Snippet from pib.gov.in reads: "ULIP serves as a unified digital gateway for logistics-related data from multiple government systems through API-based integration." API/system counts deliberately NOT entered (secondary counts conflict: 114 APIs/36 systems/8 ministries vs 125 APIs/39 systems/11 ministries) — needs human capture of an official count. PRID URL to be pinned.
v1 — Reference layer

National freight corridors

Corridor records. Length and endpoint fields are filled only from a captured DFCCIL / PIB / MoRTH primary — endpoints from secondary literature are not stored. What these corridors mean for specific industrial nodes: Industrial Nodes & Connectivity.

CorridorModeLengthCommissioned / constructedStatusEvidence
Bharatmala Pariyojana road network (Phase-I aggregate)Road34,800 km19,826 km26,425 km awarded; 19,826 km constructed as on 28 Feb 2025 (greenfield: 6,669 km awarded / 4,610 km completed).Single-source
Dedicated Freight Corridor network (EDFC + WDFC combined)Railneeds a human source2,843 kmEDFC construction complete (Dec 2023) and WDFC fully operational (Sep 2026); 1,337 km + 1,506 km.Verified
Eastern Dedicated Freight Corridor (EDFC)Rail1,337 km1,337 kmConstruction fully completed (13 Dec 2023).Single-source
Western Dedicated Freight Corridor (WDFC)Rail1,506 km1,506 kmCompleted and fully operational (final sections dedicated 8 Sep 2026).Verified
Corridor source record
Bharatmala Pariyojana road network (Phase-I aggregate)

Planned (34,800 km) and constructed (19,826 km) figures confirmed in the captured PIB/I&B doc. length_commissioned_km carries "constructed" for road programmes by convention noted here.

Dedicated Freight Corridor network (EDFC + WDFC combined)

Combined figure derived from the two corridor rows (EDFC 1,337 km per PIB; WDFC 1,506 km per JICA). Total network length kept null because the Sonnagar–Dankuni extension is outside the completed figure.

Eastern Dedicated Freight Corridor (EDFC)

One primary (PIB, Dec 2023). The Sonnagar–Dankuni section is not included.

Western Dedicated Freight Corridor (WDFC)

Two independent primaries (PMO release; JICA). DFCCIL route page gives 1,504 km; JICA 1,506 km — the higher figure is shown, the discrepancy noted.

v1 — Reference layer

Nodes — ports & logistics parks

A starter node set. Coordinates are stored only where publicly published; throughput only with a source on file. The full node layer ships with v2.

NodeTypeStateThroughputStatusEvidence
Deendayal Port (Kandla)PORTGujaratneeds a human sourceoperationalNeeds a human source
Jawaharlal Nehru Port Authority (JNPA)PORTMaharashtraneeds a human sourceoperationalNeeds a human source
Multimodal Logistics Park — representative stubMMLP—needs a human sourceplannedNeeds a human source
Mumbai PortPORTMaharashtrahighest-ever throughput, FY 2024-25 note · 68.63 cargo mt fy25operationalSingle-source
v2 — Project pipeline

Projects ≥ ₹500 crore (ITLA appraisal tier)

Not yet built — by design. v2 will list verified transport and logistics projects of ₹500 crore or more: the tier ITLA is mandated to technically appraise. A project enters only when its primary record (PIB release, ministry document, or dashboard entry) is captured and stored in the SID logistics.projects table. No project is listed from memory or trade press.

v3 — Freight-flow / O-D layer

Freight flows & origin–destination

Stub — needs a human source. ITLA’s National Transport Data Repository is mandated to integrate e-way bill, FASTag, Vahan, GPS and urban-traffic data and run freight-flow / O-D analytics. Until a public, citable flow dataset or ITLA publication exists, Techadyant will not model any flow: an origin–destination layer built on unsourced numbers would be exactly the fabrication this module exists to prevent. When ITLA (or a ministry dashboard) publishes usable flow data, this section becomes v3.

Reading the layer

Opportunity surfaces

Potential areas where demand or capability may emerge. Explicitly not claims that government will procure anything, and never forecasts of contracts.

A public aperture into the >= Rs 500 crore transport project pipeline

Analyst-assessed

ITLA is mandated to technically appraise Government of India infrastructure projects costing Rs 500 crore or more, and to monitor and run post-implementation impact assessment on them. As the SPV stands up, this mandate may produce centralised public documentation (appraisal records, monitoring outputs) for a project tier that is today scattered across ministries. Techadyant treats this as a potential research surface — v2 of this Atlas will add projects only as their primary records are captured. This states no expectation that any specific project will be announced, approved or procured.

Potential, not procurement. Analyst judgement — no external primary source.

Freight-flow / O-D analytics capability may emerge from the NTDR

Analyst-assessed

ITLA's National Transport Data Repository is mandated to integrate GSTN e-way bill, FASTag, Vahan, GPS-based and urban traffic datasets and to run freight-flow / origin-destination analytics for planning, monitoring and impact assessment. If the NTDR or ITLA publications release flow data or analyses, they may support a sourced v3 (freight-flow / O-D) layer of this Atlas. Until such a public release exists, Techadyant will not model any flows — the v3 section stays a stub marked "needs a human source".

Potential, not procurement. Conditional on future public data releases that do not yet exist.

SME Growth Fund equity may deepen Tier-II/III freight demand over time

Analyst-assessed

The SME Growth Fund's direct-equity mandate targets growth-stage SMEs with a majority orientation toward manufacturing and Tier-II/III clusters. If implemented at scale, a deepening manufacturing SME base in these clusters may, over multi-year horizons, generate additional freight demand and supplier flows along existing corridor infrastructure (DFC, Bharatmala). This is a demand-side possibility for monitoring — not a forecast, and not a claim about any procurement or scheme disbursement.

Potential, not procurement. Multi-year analyst judgement — no external primary source.

Method

How this layer is built

The module follows the same architecture as the dependency Atlas: records live in a dedicated logistics schema on the SID Supabase project, are exported by a logistics_export() RPC, and are baked to a static snapshot at build time by scripts/bake-logistics.mjs. Nothing on this page is hand-edited — a figure changes by changing the schema record (with its source link), then rebuilding. verified, single-source and analyst-assessed carry the same definitions as the rest of the Atlas (see Methodology); the fourth label, needs a human source, marks a deliberate gap: a row or field we will not fill from memory or trade press. Primary sources on file are listed per record above, including what each source supports and, where captured, the supporting text. Trade press appears only as a flagged lead, never as a sole source.

Snapshot 8 Oct 2026 · baked from logistics_export · sources retrieved 6–8 Oct 2026.