Home/Atlas/Industrial Nodes
Infrastructure & Connectivity Intelligence · Semiconductors and electronics assembly

From infrastructure maps to industrial intelligence

India publishes where its roads, rail, ports and airports are. This layer of the Atlas explains what that infrastructure means for industrial nodes — which companies and supply chains it serves, where it falls short of what an industry needs, and which opportunities open as it changes.

6 nodes · 30 infrastructure assets · 5 projects · 6 opportunity surfaces · 63 sources · Data verified: October 2026
  1. Infrastructure development
  2. Connectivity change
  3. Industrial impact
  4. Supply-chain effect
  5. Strategic dependency
  6. Second-order effect
  7. Opportunity surface

Map

DholeraSanandJewar–YEIDAJagiroadSriperumbudur–OragadamKopparthy
Industrial node · Gujarat

Dholera

India’s only approved commercial logic fab sits in a node whose road link has arrived, whose airport is close, and whose rail link is five years out. ICS: 55 (Moderate).

SemiconductorsSemiconductor fabricationElectronic materialsSolar
Open dossier →

Schematic. Positions are approximate centroids; distances on dossiers are straight-line and labelled as such.

Pilot industrial nodes

Dholera

Gujarat

India’s only approved commercial logic fab sits in a node whose road link has arrived, whose airport is close, and whose rail link is five years out.

ICS 55CGI 60
Semiconductor fabrication · Electronic materials · Solar
Open dossier →

Sanand

Gujarat

India’s first working chip-packaging cluster just gained a dedicated freight-rail station — the connectivity now runs ahead of the supplier base.

ICS 85CGI — insufficient data
OSAT / ATMP · Automotive & components · Engineering
Open dossier →

Jewar–YEIDA

Uttar Pradesh

An OSAT being built beside a new cargo airport — the rare Indian node where air logistics arrives before the factory.

ICS 75CGI — insufficient data
OSAT (display drivers) · Electronics manufacturing · Air cargo
Open dossier →

Jagiroad

Assam

India’s largest planned OSAT sits ~85 km from the nearest cargo airport and ~580 km from the nearest seaport — the pilot that tests the gap model.

ICS 45CGI — insufficient data
OSAT (advanced packaging)
Open dossier →

Sriperumbudur–Oragadam

Tamil Nadu

India’s densest electronics-assembly belt sits within ~50 km of two major ports and an international cargo airport — the test of whether gateway proximity is already priced in.

ICS 75CGI — insufficient data
Electronics assembly (smartphones, consumer electronics) · Electronic components
Open dossier →

Kopparthy

Andhra Pradesh

An operating electronics cluster ~160 km straight-line from the nearest port and ~190 km from an international cargo airport — inland economics for an import-heavy industry.

ICS 50CGI — insufficient data
Electronics assembly (TVs, laptops, surveillance) · Solar modules · E-mobility
Open dossier →

Opportunity surfaces Opportunity surface

Analytical hypotheses that start from a sourced infrastructure or investment development. They describe where demand or capability may emerge — not procurement forecasts.

What comes next

Integrated Transport & Logistics Authority

Approved by the Cabinet on 2026-10-06. Its planned national transport data repository and freight-flow analytics would let the Atlas replace distance proxies with observed flows. The schema is ready; no ITLA data is public yet, and none is modelled here. The programme-level view (DFC, Bharatmala, Gati Shakti, ITLA) is in the India Integrated Logistics Atlas.

SME Growth Fund

The ₹10,000 crore fund approved the same day will consider manufacturing SMEs in Tier II/III industrial clusters. A future SME layer will link SMEs to these nodes using Techadyant classifications only — never implied eligibility.

Phase 2

Electronics, then defence, drones, aerospace, solar and EV nodes — on the same entities, so cross-sector questions can be answered on one graph.

Infrastructure projects →Methodology & source registry →