Antonov An-32
L2 (component manufacturing) for upgrade kits at No. 1 BRD. Engine overhauls at No. 1 BRD under Ukrainian technical partnership (L1). Engine design and IP Ukrainian (L0).
IAF operates approximately 100+ An-32s delivered from 1984 onwards. Principal tactical transport workhorse. Mid-life upgrade of 40 aircraft to An-32 RE standard performed jointly by UkrOboronProm and IAF No. 1 BRD Kanpur (2009–2018). Subsequent fleet upgrade of 50+ aircraft by IAF BRDs using Indian-supplied upgrade kits. Spare-parts supply disrupted post-2022 Russian invasion of Ukraine.
No airframe manufacturing. Depot-level MRO and upgrade kits manufacturing at No. 1 BRD Kanpur. Atlas records the upgrade-kit manufacturing as L2 (component manufacturing) under Ukrainian design / IP.
- AI-20D Series 5M turboprop engineL1 · Final assembly in IndiaIndicativeIAF No. 1 BRD Kanpur performs depot overhaul of AI-20D under Ukrainian tech support; no Indian engine component manufacturing.
- FuselageL1 · Final assembly in IndiaIndicativeAntonov-supplied airframe; HAL Kanpur historically assembled some An-32 airframe components; currently depot-level structural MRO at No. 1 BRD.
- AI-20D Series 5M turboprop engine (complete unit and spares)CRITICALIndicativeIvchenko-Progress (design) + Motor Sich (manufacture) · Ukraine · single-source
- Propulsion → Engine → Ivchenko-Progress AI-20D Series 5M turboproplicensed-productionIndicativePrimary propulsion — generates thrust and shaft power
- Airframe Structure → Fuselage → Fuselage (manufactured in Ukraine / USSR; assembled by HAL Kanpur historically for some units)importedIndicativeCarries crew, troops, cargo
- 1984-06-01An-32 deliveries begindelivered
- 2009-06-01An-32 RE mid-life upgrade contract signed with UkrOboronPromdelivered
- 2018-12-01An-32 RE upgrade of 40 aircraft completeddelivered
- 2022-02-24Spare-parts supply disruption post-2022 Russian invasion of Ukrainedelivered
- No. 1 Base Repair Depot, IAF (Kanpur)Kanpur, Uttar Pradesh · Active; depot MRO ongoing for the An-32 fleet. Ukrainian tech support disrupted post-2022; IAF implementing contingency arrangements.IndicativeDepot-level MRO for An-32 fleet; airframe overhaul; structural repair; avionics upgrade
- An-32 RE mid-life upgrade — MoD statementindicativeunresolved · indicativesrc-mod-india-an32-re-upgrade
- UkrOboronProm An-32 RE upgrade technical briefingindicativeunresolved · indicativesrc-ukroborprom-an32-2016
- The Military Balance 2024crediblesrc-iiss-military-balance-2024
- Finally, India Clears Decks For 56 C-295 Transportscrediblesrc-an32-fleet-replacement-2024