Data dictionary & methodology
How Techadyant builds, verifies and maintains the maritime, port and industrial intelligence layer behind the Sagarmala programme page.
What this database is
The Sagarmala Intelligence Database is a static, version-controlled dataset in data/sagarmala-intelligence/ — eleven JSON files covering the programme dossier, the five-pillar project inventory, a national port registry, port performance time series, connectivity records, Coastal Economic Zones, coastal community initiatives, the maritime company ecosystem, policy evolution, opportunity intelligence and a coverage manifest. It reuses the Atlas’s shared source registry (data/industrial-intelligence/sources.json) and its provenance model rather than duplicating them, and it validates at build time (scripts/validate-sagarmala.mjs) — the deploy fails on any broken reference, malformed date, vocabulary violation or dishonest coverage count.
Entity model
| Entity | File · id prefix | Definition |
|---|---|---|
| Programme dossier | dossier.json · sginst: sgstat: sgvis: | Identity, approval, National Perspective Plan, pillars, institutions, funding mechanics, dated statistics, Sagarmala 2.0 status, vision links, timeline. |
| Infrastructure project | pillar-projects.json · sgpr: | Flagship project with pillar, location, cost (or an explicit null with cost_note), status, agency, milestones, contractors, consequences. |
| Port / maritime asset | ports.json · sgport: | Major port, dock system, major port under construction or non-major port, with authority, coordinates (with source grade), throughput by financial year and documented Sagarmala project links. |
| Performance series | port-performance.json · sgs: | Annual time series (cargo, containers, capacity, turnaround, detention, IWT, coastal) where every point carries period, value and source; incompatible definitions are separate series. |
| Connectivity record | connectivity.json · sgx: | A documented port-to-network connection (road, rail, waterway, Ro-Pax) with directness, status, cost and agency. Proximity is never connectivity. |
| Coastal Economic Zone | industrialisation.json · sgcez: | One of the 14 NPP zones with linkage ports, intended sectors and verified “proposed” status. |
| Community initiative | community.json · sgcc: | Coastal community programme line (fishing harbours, skilling, tourism, Ro-Pax) with reported outputs kept distinct from outcomes. |
| Company | companies.json · sgco: | Company with evidenced relationships (operates / acquired / concession / contract / supply / fleet) to ports, terminals, projects or yards. |
| Policy | policies.json · sgpol: | Policy or programme-evolution record with announcement date, approval date, status (proposed / announced / approved / operational), objectives and funding. |
| Opportunity | opportunities.json · sgo: | Techadyant opportunity intelligence record: sourced trigger, labelled reasoning, customers, dependencies, constraints, confidence, evidence still needed. |
| Coverage manifest | coverage.json | Tier status, record counts (cross-checked against the files by the validator), pillar and state coverage, verification distribution, discrepancy register, known gaps. |
Relationships are typed on the records themselves: projects reference ports (port_id), ports reference projects (sagarmala_project_ids), opportunities reference projects, ports, companies and policies, and companies reference ports and projects. The validator enforces every one of these edges both ways.
Identifiers
Identifiers are stable and namespaced (sgpr:, sgport:, sgco:, sgo:, sgpol:, sgcez:, sgcc:, sgx:, sgs:, sginst:, sgstat:, sgvis:, sgdisc:). The layer does not duplicate shared Atlas entities: ports that the Atlas already registers live in data/industrial-intelligence/infrastructure-nodes.json (Mumbai Port was completed and JNPA’s coordinates upgraded there), and the programme record itself remains the single dossier in data/programme-intelligence/programmes.json.
Evidence & provenance
Every claim carries an evidence class — fact (sourced), derived (computed from sourced inputs, method stated) or analysis (Techadyant judgement, hedged language). Facts require provenance; analysis may cite context. Provenance references point at the shared source registry; the programme page renders one numbered source list for the intel layer and the database together, so every bracketed citation resolves. Unknown values are explicit nulls with notes — never guesses. Analytical text avoids unhedged “will”; the validator warns when it finds one.
Source hierarchy
| Tier | Classes | Used for |
|---|---|---|
| Tier 1 — primary | PIB, MoPSW (shipmin.gov.in statistics and division pages), parliament answers (sansad.in), Union Budget documents, PMO speeches, IWAI, port authorities, project SPVs | Project status, portfolio statistics, port capacity and throughput, expenditure, approvals, contracts. |
| Tier 2 — authoritative supporting | Company sites and disclosure-derived records (Adani, DP World, PSA, APM/Maersk, JSW, SCI, GRSE, L&T, ZPMC), Kerala Maritime Board | Operator relationships, fleets, order books, acquisitions. |
| Tier 3 — secondary discovery | Reputable trade press and reference works (Maritime Gateway, Loadstar, Financial Express, SCC Times quoting PIB, Wikipedia mirrors of WAF-blocked ministry pages) | Discovery and corroboration, always flagged; never the sole basis for a critical claim. |
Where sagarmala.gov.in blocks automated capture, the affected facts are held via the best available mirror and the limitation is stated on the record. Snippet-level findings without a captured URL are excluded or recorded as research leads — never silently promoted to facts.
Statistical standards
- Programme portfolio (845 projects) and scheme-funded projects (128) are two scopes; they are never summed or mixed in one table row.
- Financial years are never mixed with calendar years inside one series; FY2025-26 advance estimates are labelled against final figures, and both are retained when official publications disagree.
- Port-level throughput and terminal-level figures are kept in different records; a port’s total never includes terminal subtotals.
- Planned capacity, commissioned capacity and actual throughput are three different fields on a project or port record.
- Ministry-reported beneficiary and employment figures are recorded as reported values with dates — not as verified outcomes.
- The IWT FY26 218 MMT claim is retained but flagged (no NW-wise FY26 publication to cross-check the jump from 145.84 MT).
Coverage tiers
Coverage is graded, not claimed: Tier A (programme foundation) is complete; Tier B (national maritime infrastructure) is a defensible core — all 12 major ports, the two under-construction major ports, the largest non-major ports, portfolio statistics and the cargo time series FY2014-15 to FY2025-26; Tiers C and D are seeded (14 CEZs, 24 companies, 9 documented connectivity records, 10 opportunity records). The coverage manifest’s record counts are enforced against the data files by the build validator, so the manifest cannot drift from the records.
Opportunity classification
Opportunity intelligence is classified as documented demand (a contract, order or award already evidences the demand), emerging (sourced trigger, reasoned effect), hypothesis (analytical construction on sourced foundations — e.g. the CEZ surface, whose trigger evidence documents an absence) or research lead (direction needing more evidence). No market size, revenue forecast, investment return or cargo volume is invented; quantification is limited to what cited sources state.
Update procedure
Update triggers: PIB Sagarmala/MoPSW releases, the monthly TRW cargo reports and annual Basic Port Statistics, parliament sessions, the February Union Budget, and Vadhavan/Vizhinjam phase milestones. Procedure: add or update the record with new provenance; append new sources to the shared registry; keep the older observation with its date rather than overwriting; run npm run validate:sagarmala; align coverage.json counts; bump last_verified. Records older than 120 days are flagged stale by the validator.
Known limitations
- The full 845-project portfolio is not itemised — the ministry publishes no machine-readable list and sagarmala.gov.in is WAF-blocked for capture.
- Terminal-level inventories for all major ports are not yet captured.
- A few 2026 trade-press findings without captured URLs (Kamarajar’s second container terminal tender, SCI privatisation status) are excluded from the database and recorded as gaps.
- Vessel-turnaround series differ by definition across official sources; they are kept as separate labelled series, never merged.
Downloadable extracts (CSV): projects · ports · performance · companies · sources. Architecture notes: docs/sagarmala-intelligence-integration.md.