STT Chennai Siruseri campus
STT Chennai Siruseri is an AI-ready 45 MW campus, with the first 7.2 MW phase operational as of the February 2026 STT GDC announcement.
Relationships
- Operated bySTT GDC India— STT says Siruseri is designed as a 45 MW AI-ready campus.