Kopparthy (shared with VCIC)
2,595 acresArea
₹1,274 crTrunk-infra cost
Kopparthy is folded into the same AP SPV as Orvakal and got its PM foundation stone alongside it in October 2025. It is primarily the VCIC electronics node (Dixon-anchored EMC) — see the Vizag–Chennai profile for its full tenant file — and is shown here because it is also an HBIC anchor.
Industries coming up
Electronics manufacturing (EMC)MSMESolar / renewablesGeneral manufacturing
Infrastructure & connectivity
- NICDIT footprint 2,595 acres (of ~5,760); part of the YSR Jagananna Mega Industrial Hub + EMC
- PM foundation stone 16 Oct 2025; EPC LoA 9 Oct 2025; 878 acres + ₹300 cr equity transferred
- Master plan notified 11 Sep 2025; EC Aug 2024
Cross-listed node
Kopparthy’s full intelligence file (Dixon Technologies anchor, YSR EMC under MeitY EMC-2.0) is on the Vizag–Chennai corridor page, where it is the primary listing. The HBIC SPV co-develops it with Orvakal.